Beta
Draxon VR Training SyllabusPreparation
Room Setup
- Seating: Fixed chairs (avoid swivels and armrests).
- Spacing: 1.5m clearance (approx. 2 arm lengths) between chairs.
- Hygiene: Have antibacterial wipes and microfiber cloths ready.
Hardware Ready-Check
- Updates: Turn on Router + Headsets 30 mins before session to allow auto-updates.
- Battery Pack Check: Press button on battery pack. Needs 2+ LEDs lit. Replace low batteries.
- Headset Battery Check:
- ⚪ White: Battery full
- 🟢 Green: Fully charged
- 🟠 Orange: Charging
- 🔴 Red: <10% (Charge immediately)
- Equipment: Place 1 Headset + 2 Controllers (with wrist straps) on each chair.
- Controller Batteries: Keep spare AA batteries nearby.